This paper represents the study of deburring process and process parameters. There are many factors that influence the productivity of a manufacturing organization. The most widely tackled issue is how to improve efficiency and productivity. Method study is basically conducted to simplify the work or working methods and must go towards higher productivity. It is always desirable to perform the requisite function with desired goal minimum consumption of resources. Throughout the study, the aim is to propose a new system to the related company to increase their productivity. The purpose of this paper is to discuss related issues of motion and time study implementation and assembly line balancing and its influence toward productivity improvement. Actual time and standardized time is compared and as a result it is aimed that measuring inevitable times and take necessary precautions against them. As a result of the study, waiting time cause inefficiency in the work of molder and in the content of work/time, efficiency is increased.
Real Time Impact Factor:
Pending
Author Name: Kiran R. Jadhav, Prasad V. Handral, Gaurav H. Balkawade, Pratik C. Dhamale, Amit S. Chaudhary
URL: View PDF
Keywords: productivity improvement, manufacturing industries, assembly line balancing, motion and time study analysis.
ISSN: 2394-9007
EISSN: 0000-0000
EOI/DOI: Volume-V, Number-III, June 201
Add Citation
Views: 1